Thursday 12 May 2011

PROJECT 2: The Beginning of the Transformation

The half cut Toyota 4A-GE AE86 Levin has finally arrived at the workshop! The KE-35's engine has been taken out and the new engine is going in! Apparently, this 4A-GE engine has done about 100,000km so the timing belts and the clutch has to be changed along with all the rubber hoses. So more $$$ has to be invested in buying these parts.
The engine bay empty.

But I'm really not satisfied with the half cut shop. They gave me a bad condition drive shaft, a rusted fuel tank, and the rear axle is in bad condition as well. I can't even reuse the fuel pump from the fuel tank. At least I got the AP form from them, and this little piece of paper will help with the inspection later on. Thats the last time I go back to that half cut shop, sick of dealing with them.

A close up on the rear axle, right side brake disc .


The horrible condition rear axle.

The boys putting in the new engine in the car.
So now the boys are putting on the engine and it looks like a lot of work. The half cut arrived on Monday, its Thursday and its just about to be fitted into the car. The focus now is on the engine and fitting it in the car, once this is done then its the drive shalf, and rear axle's turn to get in the car. If the brakes and the springs are good and the engine is fine, its time to get the JPJ runner and get the car inspected! Once inspection is done, I'm open to do anything to the car. Can't wait till I can really start modifying the car!                                                                                                                            

No comments:

Post a Comment